Search

Coal Mining Risk Assessment

If you are seeking planning permission in an area with a mining history, a local authority will require a Coal Mining Risk Assessment.

If you need a quote, contact us via the form here.

"Fast & efficient. I got my quote within 24 hours"

Louise Reynolds

Get Your FREE Quote

Lead form

Step 1 of 3

This field is for validation purposes and should be left unchanged.

Where shall we send your free quote to?

How it Works

From Request to Results - Fast and Hassle-Free

We make finding reliable professionals easy. In just three quick steps, you can request free quotes, compare prices, and hire with confidence. No stress, no hidden costs, just qualified experts ready to help.

Why Choose Us

Quotes from trusted providers, without the hassle

You've got a lot on your plate with your project. Finding a reliable provider for the range of jobs you need doing is extra hassle you don't need.

That's where we come in. We've already know, and work closely with a wide range of trusted providers for all kinds of services.

I needed quotes for a range of services to help me get my planning application approved on a barn conversion I was working on. I tried 24Housing and I got the quotes I neeeded next day from local companies. They did a great job and helped my project run smoothly.

Phil Clarke

Requirement of a Coal Mining Risk Assessment

In the UK’s quest to unlock more land for housing, we are frequently confronted by the ghosts of our industrial past. A Coal Mining Risk Assessment (CMRA) is not just a bureaucratic hurdle; it is a statutory requirement and a critical safeguard for any new developments located within high-risk areas shaped by a historical coal mining legacy.

For local authorities, housing associations and private developers, this document is the foundation of site viability. By identifying specific coal mining risks relating to past coal mining activity early, a CMRA ensures regulatory compliance, protects capital investment, guards against other safety risks and provides a clear roadmap for mitigating ground instability, gas migration and subsidence.

Areas close to former mining activities will require a Coal Mining Risk Assessment before planning consent will be granted.
Former coal mine workings.

What is a Coal Mining Risk Assessment?

A CMRA is a specialist technical report that makes a thorough evaluation of the potential hazards associated with historic coal mining activity on or near a proposed development site.

Because abandoned mine workings often lead to unpredictable ground stability, this ground investigation is essential for determining the historical legacy, structural integrity and safety of the land.

The geological insights provided assist both developers and planning authorities in deciding whether specific engineering operations and interventions are required to deal with coal mining issues before construction begins on new developments.

When is a Coal Mining Risk Assessment Report Required?

A Coal Mining Risk Assessment is usually mandated during the planning process, particularly for sites within designated Coal Mining Reporting Areas or a development high-risk area. Understanding when to trigger this assessment can be the difference between a smooth approval and a costly delay.

1. Applications for Planning Consent

Local Planning Authorities (LPAs) generally require a CMRA for developments in a high-risk area with mining-related issues. A report prepared by a competent person ensures that hazards are addressed upfront, leading to a more rapid discharge of planning conditions.

2. Structural Safety and Stability

Developers must account for abandoned mine entries, tunnels and shallow workings when designing foundations. The assessment provides the data needed to determine whether a scheme is commercially viable or requires specialised engineering solutions to make the ground safe and stable.

3. Public Health and Mine Gas

Old workings can be conduits for hazardous ground gas, such as methane and carbon dioxide. A CMRA evaluates the risk of these gases migrating into new structures, protecting future occupants from fire, explosion or asphyxiation risks.

4. Due Diligence and Transactions

For investors and institutions purchasing land, a CMRA is a vital component of due diligence. It identifies potential liabilities and “unbuildable” zones on or near a site location before a transaction is finalised.

Coal Mining Risk Assessment Exemptions

Specific exemptions are in place, preventing developers from referring to a coal mining risk assessment if it simply isn’t needed. For instance, a full CMRA may not be necessary if the site is outside of a development high-risk area or if there are no potential sources of mine gas or unstable ground.

It could even be that a full assessment on a development high-risk area is unnecessary, but this can only be confirmed by the local council. For this to happen, a desk-based CMRA would need to be carried out, with the regulatory information from the desk-based study and assessment of coal authority records confirming that no further surveys are needed.

A Coal Mining Risk Assessment investigates dangers from potential contamination.
A coal mining risk assessment consultant conducts a survey.

Key Hazards of Former Mining Activities

The legacy of the Coal Authority’s historic workings presents several distinct physical and environmental risks:

  • Ground Subsidence: Underground shallow workings can collapse over time. This leads to surface subsidence and unstable ground that can catastrophically damage buildings, utilities and road infrastructure.
  • Mine Shaft Hazards: Abandoned shafts and mine entries that were improperly sealed present a significant collapse danger and subsidence risks.
  • Gas Emissions: Disused mines often harbour pockets of pressurised gas. Gas monitoring, proper ventilation and specialised gas membranes are frequently recommended to ensure site safety.
  • Water Ingress: Mining often alters natural groundwater movement. This can result in localised flooding or unexpected water pressure in excavations and basements.
  • Contaminated Land: Residues from coal mining, including heavy metals, hydrocarbons and sulphates, can contaminate soil and groundwater, requiring remediation before a site is deemed safe for residential use.

Coal Mining Risk Assessment Guidance

Our coal mining risk assessment guidance covers every consideration needed to meet the requirements of the local authorities.

The Assessment Process

A robust Coal Mining Risk Assessment is typically conducted in phases by experienced geo-environmental consultants.

Phase 1: Desk-Based Assessment

The desk-based study identifies a range of issues: it involves a coal mining risk assessment consultant conducting an exhaustive review of historical and geological data, including:

  • Coal Authority records and abandonment plans.
  • Historical maps and geological survey records.
  • Identifying shallow coal seams and known mine shafts.
  • Identifying potential sources of ground gas.

Phase 2: Intrusive Site Investigation

If the desk-based assessment identifies potential risks, a site walkover and intrusive investigation is required. This is a more detailed investigation than the desk-based CMRA and often involves:

  • Borehole Drilling: Extracting samples to determine exact ground conditions.
  • Geotechnical Testing: Evaluating ground stability, soil strength and the potential for subsidence.
  • Ground Gas and Groundwater Monitoring: Measuring methane levels and assessing water ingress risks.

Phase 3: Mitigation Measures and Reporting

Once the data is analysed, the consultant proposes specific mitigation strategies. These may include engineering operations such as ground reinforcement (such as grouting or piling), shaft capping, or the installation of gas venting systems. The final coal mining risk assessment report is then submitted to the LPA to satisfy statutory consultees and secure planning permission.

Use an Experienced Coal Mining Risk Assessment Consultant

Navigating the complexities of the Coal Authority’s legacy requires professional expertise and consideration of all regulatory information, whether within a development low-risk area or a high-risk part of the country.

Acquiring the geological information about a site where former coal mining activities have taken place, and the potential risks posed, will assist developers with risk mitigation strategies when it comes to planning applications for a development project.

By engaging geo-environmental consultants with experience of providing comprehensive Coal Mining Risk Assessments across the UK, you give yourself the best chance of avoiding costly surprises and achieving a successful, safe development scheme.

Early intervention and a risk-based approach is key, giving you time to assess commercial advice. Conducting a CMRA at the start of your planning application journey ensures that your development proposals remain viable, compliant, and above all, safe for the community.

Our Coal Mining Risk Assessment Consultant Team

Throughout every step of the process, our team will offer support and advice on any concerns you have about your development site and any overlap between your plans and the risks caused by nearby historical mines.

We remain involved with clients from start to finish and won’t rest until planning permission has been confirmed. Every member of our team has the qualifications, experience and skills to evaluate your site, and we’ve seen every possible issue that would otherwise prevent planning acceptance.

Coal Mining Risk Assessment Cost

It’s perfectly understandable that before you reach out for an inspection, you ask about coal mining risk assessment cost. One of the factors we pride ourselves on is our insistence on keeping our prices competitive, fair and easy to logically justify to clients.

Part of what affects the price of a coal mining risk assessment report is the level of service needed, with certain development sites needing complete assessments and others only requiring the desk study phase. Our quotes always start with a baseline cost, and from there, we only add on what we need to based on the scale of the project.

Booking a Coal Mining Risk Assessment for Planning Application Purposes

You may need a desk study by itself or a full coal mining risk assessment with the ground investigation involved. Whatever the size and purpose of development proposals, we are equipped to provide coal mining risk assessments to clients all over the country and offer commercial advice to architects, developers and landowners.

As soon as the inspection has been concluded, the coal mining risk assessment consultant will put together a coal mining report directly covering risk factors, and we will continue to support you with any other coal mining risk assessment services you need. Request a free quote by emailing us, calling us or visiting our contact page and speaking with our team.

Common Questions

The Coal Authority maintains records of designated Coal Mining Reporting Areas and development high-risk areas across the UK, and your local planning authority will be able to confirm whether your site falls within one. In most cases, if your site is in a high-risk area, a Coal Mining Risk Assessment will be a condition of your planning application before any work can begin. If you are unsure, a desk-based assessment is the appropriate starting point, as it draws on Coal Authority records and historical data to establish whether further investigation is needed.

A desk-based assessment is the first phase of the process and involves a review of historical records, geological surveys, Coal Authority abandonment plans and known mine shaft locations. In some cases, this is sufficient to confirm that no further investigation is required. Where the desk-based study identifies potential hazards, an intrusive site investigation is then carried out, involving borehole drilling, geotechnical testing and ground gas monitoring. The full assessment combines both phases and produces a report with recommended mitigation measures for submission to the local planning authority.

In most cases, yes. A Coal Mining Risk Assessment does not automatically make a site unbuildable. Once the specific hazards have been identified, geo-environmental consultants can recommend targeted engineering solutions such as ground reinforcement through grouting or piling, shaft capping, or the installation of gas venting and membrane systems. These measures are designed to make the ground safe for construction and future occupants. Identifying the issues early through a CMRA gives developers the time and information needed to incorporate any required works into the project plan without causing significant delays.