Search

Geotechnical Survey

A Geotechnical Survey will investigate soil and rock beneath the ground to provide information about soil stability and potential pollution.

Contact us for a quote today.

"Fast & efficient. I got my quote within 24 hours"

Louise Reynolds

Get Your FREE Quote

Lead form

Step 1 of 3

This field is for validation purposes and should be left unchanged.

Where shall we send your free quote to?

How it Works

From Request to Results - Fast and Hassle-Free

We make finding reliable professionals easy. In just three quick steps, you can request free quotes, compare prices, and hire with confidence. No stress, no hidden costs, just qualified experts ready to help.

Why Choose Us

Quotes from trusted providers, without the hassle

You've got a lot on your plate with your project. Finding a reliable provider for the range of jobs you need doing is extra hassle you don't need.

That's where we come in. We've already know, and work closely with a wide range of trusted providers for all kinds of services.

I needed quotes for a range of services to help me get my planning application approved on a barn conversion I was working on. I tried 24Housing and I got the quotes I neeeded next day from local companies. They did a great job and helped my project run smoothly.

Phil Clarke
Geotechnical engineers dig boreholes to test soil composition.
Using geotechnical survey equipment, boreholes are dug to enable soil testing on a site.

Geotechnical Surveys for Development Projects

For a full understanding of the risks that may lie beneath the ground on a proposed site, a developer is likely to need a geotechnical survey.

This professional report will provide a comprehensive assessment of soil and rock properties, ground and groundwater conditions, pollution issues, chemical properties, natural hazards and other potential liabilities.

Safeguarding human health is a priority for a wide range of environmental agencies when it comes to breaking ground for new development and regulatory compliance is essential.

What is a Geotechnical Survey?

It’s an investigation to determine the physical properties of the soil and rock beneath a site. Before any construction begins, engineers must understand the ground conditions to ensure that the foundations are designed safely and efficiently.

By performing a geotechnical investigation, developers can gain valuable insights into a proposed development site. A geo-environmental investigation is an accurate method of enabling identification of potential issues such as low load-bearing capacity, ground instability or a high water table level.

The range of geotechnical data from these site investigations is essential for structural engineers to determine the soil structure, its structural integrity and the correct type of foundation, whether that be standard strip footings or complex piled solutions. It will inform decisions about any geotechnical engineering required to make a site deliverable.

Options might involve shallow concrete strip footings being used for load bearing soils, or in weaker soils, piled footings may be used, driving vertical columns into deeper soil to transfer loads safely. The question of how long do geotechnical surveys take depends on the individual site features.

Why Geotechnical Surveys are Essential for Developers

Undertaking geotechnical surveys early in the planning process helps to mitigate financial risks and construction delays. In the housing sector, unforeseen ground conditions are one of the most common causes of budget overruns.

A comprehensive geotechnical survey provides insights into soil properties, soil structure, site conditions, the subsurface and groundwater conditions, allowing for accurate cost estimations and material specifications.

Without this geotechnical information, developers may face structural failures, subsidence, or costly remedial works later in the life of the building, making the cost effectiveness of a geotechnical report clear.

Soil layers are investigated during a geotechnical survey.
Geotechnical engineers assess soil structure in the ground beneath a development site.

Ground Investigation: Geotechnical Survey Methods

The procedure for conducting geotechnical surveys typically involves several stages of data collection. The result is a geotechnical report which will contain recommendations that a developer can rely on when it comes to planning a design scheme.

It will also contain information about any ground improvement work needed. This report will also answer any queries from a local planning authority about the safety of the site below the surface.

Geotechnical Survey Equipment and Methods

The initial stage involves a desk study to review geological maps and historical records of the area. Following this, site-specific fieldwork is carried out, which may include boreholes, trial pits and ground penetration tests, all requiring a range of technical excavating and boring equipment.

These methods allow specialists to extract soil samples for laboratory testing. The resulting data from site investigations helps in assessing the properties of soil, soil strength, compressibility and chemical composition, all of which influence the final design of a housing development.

Interpreting the Geotechnical Investigation Report

Once the fieldwork and lab testing are complete, the findings are compiled into a detailed report. This document provides specific recommendations for foundation design and any necessary ground improvement techniques required.

For housing providers and local authorities, this report acts as a vital piece of evidence for building control and planning departments. It ensures that the proposed structures are compatible with the land they are built on, ensuring the long-term safety of future residents.

Other Types of Geotechnical Survey Work

As well as the geotechnical soil survey, geotechnical survey companies carry out a range of other types of geotechnical survey to fulfil regulatory requirements, including marine geotechnical surveys, deep water geotechnical surveys, the offshore geotechnical survey and the offshore geophysical and geotechnical survey.

Geotechnical consultants examine soil samples.
Subsurface conditions: soil samples being taken for a stability analysis.

Expert Solutions for Residential Construction

Reliable geo environmental investigation is the backbone of any successful construction project. At 24Housing, we understand that providing high-quality homes starts with a solid foundation and the first step is accurate environmental data.

Geotechnical Survey Cost

The costs of this type of ground stability analysis will vary according to the scale and location of the project.

Securing Professional Geotechnical Support

Working with experienced geotechnical consultants ensures that your project complies with regulatory requirements such as relevant building regulations and industry standards.

By investing in thorough investigations, housing developers can build with confidence, knowing that their sites are secure and their structural designs are optimised for the specific conditions of the ground beneath the development.

Common Questions

Ideally as early as possible, and certainly before detailed design work begins. Carrying out a geotechnical survey early in the planning process means that any ground-related constraints, such as low load-bearing capacity, ground instability or a high water table, can be identified and factored into the foundation design from the outset. Unforeseen ground conditions discovered later in a project are one of the most common causes of budget overruns and construction delays in housing development. Commissioning a survey at the pre-application or early design stage gives developers the information they need to make accurate cost estimates, choose the right foundation type and avoid costly remedial works further down the line.

A desk study is the first stage of a geotechnical survey and involves reviewing geological maps, historical records and any existing environmental data relevant to the site. It is used to build an initial picture of likely ground conditions and to identify where further investigation may be needed. An intrusive investigation follows if the desk study highlights potential risks or uncertainties, and involves physical fieldwork on site such as boreholes, trial pits and ground penetration tests. Soil and rock samples extracted during this stage are sent for laboratory testing to assess properties such as strength, compressibility and chemical composition. Together, both stages inform the final geotechnical report and its recommendations for foundation design.

A geotechnical report provides the local planning authority and building control with evidence that the ground conditions on a proposed development site have been properly assessed and that the design has been appropriately adapted to suit them. Planning authorities and building control departments need to be satisfied that proposed structures are compatible with the land they are to be built on, particularly where there is any risk of subsidence, ground instability or contamination. The report sets out findings from the site investigation alongside specific recommendations for foundation design and any ground improvement works required, giving both the developer and the relevant authorities the confidence that the scheme has been designed with long-term safety in mind.